Tickets & Compliance
ProQual L3 Engineering Surveying
CPCS A17C — Telehandler
Operational Evidence
10+ Years
HS2 Infrastructure
Setting Out
Leica TS16
GNSS · RTK
Telehandler
Lift Plans
AutoCAD
Plant Checks
Civils
Quick Snapshot
Site Types
Civils, Infrastructure, Residential
Instruments
Leica TS16, CS20, GNSS Rover
Work Experience
Setting Out Engineer — Training & Development
Self-employed · London
2024 – Present
Engineering Surveying · London
ProQual Level 3 Diploma in Engineering Surveying completed Feb 2026 — Buckingham School of Setting Out Engineers.
Leica TS16 total station — setup, backsight, resection to millimetre project tolerances.
GNSS / RTK rover and base, DOP values, multipathing and cycle slips.
TBMs, control networks, site grids, datum principles and AutoCAD.
Construction Plant Operator — Telehandler
HS2 Infrastructure
2021 – 2024
HS2 Corridor · Major Infrastructure
2.5 years on HS2 in high-spec safety culture with structured site controls and strict method statements.
Supported engineers, groundworkers, and bricklayers with logistics, material movement, and plant operations.
Chainman duties alongside setting-out engineers — early exposure to survey processes and control networks.
Construction Plant Operator — Telehandler
Various Contractors
2017 – 2021
London & South East · Commercial, Civils, Warehousing
Seven years operating telehandlers across residential, commercial, and civils sites in London and South East.
Daily plant checks, defect reporting, lift plans, and safe material distribution to active site gangs.